[1]
K. N. Sayle and I. A. Al- Janabi, “Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)”, AJES, vol. 1, no. 1, pp. 143–159, May 2008, doi: 10.37649/aengs.2007.14260.