University of Anbar
  • Register
  • Login
  • العربیة

Anbar Journal for Engineering Sciences

  • Home
  • Browse
    • Current Issue
    • By Issue
    • By Subject
    • Keyword Index
    • Author Index
    • Indexing Databases XML
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • News
  • Abstracting & Indexing
  • Guide for Authors
  • Submit Manuscript
  • Contact Us
Advanced Search

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 2, Issue 2
  3. Author

ISSN: 1997-9428

Volume2, Issue2

Practical Implementation of SCADA System for Falluja Substation

    Salih Mohammed Salih

Anbar Journal for Engineering Sciences, 2009, Volume 2, Issue 2, Pages 28-46

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

The Digital control systems for substations have been installed in different areas of Iraq in the recent years. Most of these techniques used a Supervisory Control And Data Acquisition (SCADA) with Remote Terminal Unit (RTU) for monitoring the metering devices for incoming and outgoing feeders, while the other system used a Programmable Logic Control (PLC) technique for controlling and monitoring the system inside substations by professional engineers. A practical monitoring system of SCADA with RTU has been introduced in this paper for Falluja substation. There are 3 devices of RTUs are used to collect data from ION 6200 devices installed inside incoming and outgoing panels for low Voltage (LV 380V), 33KV and 11KV, then the data from each RTU will be send to the SCADA (main Computer) via special router, the SCADA system used ION enterprise software supplied by AREVA company in addition to all panels which supplied by the same company. Many difficulties were appeared during the work, such as mistakes of IPs, setting parameters, selection of protocols, and matching of devices have solved until the normal work was obtained to the substation.
Keywords:
    SCADA RTU PLC MiCOM Falluja Substation
  • PDF
  • XML
(2009). Practical Implementation of SCADA System for Falluja Substation. Anbar Journal for Engineering Sciences, 2(2), 28-46.
Salih Mohammed Salih. "Practical Implementation of SCADA System for Falluja Substation". Anbar Journal for Engineering Sciences, 2, 2, 2009, 28-46.
(2009). 'Practical Implementation of SCADA System for Falluja Substation', Anbar Journal for Engineering Sciences, 2(2), pp. 28-46.
Practical Implementation of SCADA System for Falluja Substation. Anbar Journal for Engineering Sciences, 2009; 2(2): 28-46.
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 136
  • PDF Download: 52
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
Journal Information

Publisher: University of Anbar

Email:  ajes.uoanbar.edu.iq

Editor-in-chief: Prof. Dr. Yousif Al Mashhadany

  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap
This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus