University of Anbar
  • Register
  • Login

Anbar Journal of Engineering Sciences

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 2, Issue 2
  3. Author

Current Issue

By Issue

By Subject

Keyword Index

Author Index

Indexing Databases XML

About Journal

Aims and Scope

Editorial Board

Publication Ethics

Indexing and Abstracting

Related Links

Peer Review Process

News

Facts and Figures

Reviewers in AJES

Practical Implementation of SCADA System for Falluja Substation

    Salih Mohammed Salih

Anbar Journal of Engineering Sciences, 2009, Volume 2, Issue 2, Pages 28-46
10.37649/aengs.2009.14237

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

The Digital control systems for substations have been installed in different areas of Iraq in the recent years. Most of these techniques used a Supervisory Control And Data Acquisition (SCADA) with Remote Terminal Unit (RTU) for monitoring the metering devices for incoming and outgoing feeders, while the other system used a Programmable Logic Control (PLC) technique for controlling and monitoring the system inside substations by professional engineers. A practical monitoring system of SCADA with RTU has been introduced in this paper for Falluja substation. There are 3 devices of RTUs are used to collect data from ION 6200 devices installed inside incoming and outgoing panels for low Voltage (LV 380V), 33KV and 11KV, then the data from each RTU will be send to the SCADA (main Computer) via special router, the SCADA system used ION enterprise software supplied by AREVA company in addition to all panels which supplied by the same company. Many difficulties were appeared during the work, such as mistakes of IPs, setting parameters, selection of protocols, and matching of devices have solved until the normal work was obtained to the substation.
Keywords:
    SCADA RTU PLC MiCOM Falluja Substation
  • PDF (743 K)
  • XML
(2009). Practical Implementation of SCADA System for Falluja Substation. Anbar Journal of Engineering Sciences, 2(2), 28-46. doi: 10.37649/aengs.2009.14237
Salih Mohammed Salih. "Practical Implementation of SCADA System for Falluja Substation". Anbar Journal of Engineering Sciences, 2, 2, 2009, 28-46. doi: 10.37649/aengs.2009.14237
(2009). 'Practical Implementation of SCADA System for Falluja Substation', Anbar Journal of Engineering Sciences, 2(2), pp. 28-46. doi: 10.37649/aengs.2009.14237
Practical Implementation of SCADA System for Falluja Substation. Anbar Journal of Engineering Sciences, 2009; 2(2): 28-46. doi: 10.37649/aengs.2009.14237
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 169
  • PDF Download: 62
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap
This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus