University of Anbar
  • Register
  • Login

Anbar Journal of Engineering Sciences

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 1, Issue 1
  3. Authors

Current Issue

By Issue

By Subject

Keyword Index

Author Index

Indexing Databases XML

About Journal

Aims and Scope

Editorial Board

Publication Ethics

Indexing and Abstracting

Related Links

Peer Review Process

News

Facts and Figures

Reviewers in AJES

Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)

    Khmis N. Sayle Ibrahim A. Al- Janabi

Anbar Journal of Engineering Sciences, 2008, Volume 1, Issue 1, Pages 143-159
10.37649/aengs.2007.14260

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

Recently our country is witnessed an implementation of many construction with high stories . thus , the accuracy of implementation and monitoring of survey works should be consider . in this paper quality control in survey works in AL-RAHMAN Mosque were studied as a case study .
The magnitude and correlation of errors are importance to the design stage, measuring and adjustment development .in the design stage the study of errors is very important to provide us the basic chose of fingers , selection of instrument types, and proper procedures to get the specified accuracy , in the measuring sate the stud of errors is an important because it give us acceptation or rejection limitation in the site. In the adjustment operation the study of errors give us an increment in can riddance level the result of present paper indicated that there are conclusion and recommendation should be considered to accept or reject in future works.
Keywords:
  • PDF
  • XML
(2008). Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque). Anbar Journal of Engineering Sciences, 1(1), 143-159. doi: 10.37649/aengs.2007.14260
Khmis N. Sayle; Ibrahim A. Al- Janabi. "Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)". Anbar Journal of Engineering Sciences, 1, 1, 2008, 143-159. doi: 10.37649/aengs.2007.14260
(2008). 'Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)', Anbar Journal of Engineering Sciences, 1(1), pp. 143-159. doi: 10.37649/aengs.2007.14260
Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque). Anbar Journal of Engineering Sciences, 2008; 1(1): 143-159. doi: 10.37649/aengs.2007.14260
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 117
  • PDF Download: 39
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap

This journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)

This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus