University of Anbar
  • Register
  • Login

Anbar Journal of Engineering Sciences

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 4, Issue 1
  3. Author

Current Issue

By Issue

By Subject

Keyword Index

Author Index

Indexing Databases XML

About Journal

Aims and Scope

Editorial Board

Publication Ethics

Indexing and Abstracting

Related Links

Peer Review Process

News

Facts and Figures

Reviewers in AJES

Evaluation of Parking Areas in Ramadi CBD

    Thaer Sh.Mahmmod

Anbar Journal of Engineering Sciences, 2011, Volume 4, Issue 1, Pages 131-152
10.37649/aengs.2011.14268

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

The car parking problem in Ramadi CBD Area is considered the important urban problems that the Ramadi city suffer especially in the CBD area. Traffic problems are the main challenge of the CBD areas which has direct relationship related to the city commercial use.
The CBD main streets were chosen as a case study and the parking area on them were surveyed. The study explained that there is a sharp lack in the parking areas especially in the districts no. 4, 6, 7, and 9. The parking in the surveyed area are of on-street type.
In this study there is number of conclusions, recommendations and suggestions for the short and long term projects related to this issue to put plans for solving this urban problem in Ra-madi CBD.
Keywords:
    city planning Parking Areas Ramadi city
  • PDF (371 K)
  • XML
(2011). Evaluation of Parking Areas in Ramadi CBD. Anbar Journal of Engineering Sciences, 4(1), 131-152. doi: 10.37649/aengs.2011.14268
Thaer Sh.Mahmmod. "Evaluation of Parking Areas in Ramadi CBD". Anbar Journal of Engineering Sciences, 4, 1, 2011, 131-152. doi: 10.37649/aengs.2011.14268
(2011). 'Evaluation of Parking Areas in Ramadi CBD', Anbar Journal of Engineering Sciences, 4(1), pp. 131-152. doi: 10.37649/aengs.2011.14268
Evaluation of Parking Areas in Ramadi CBD. Anbar Journal of Engineering Sciences, 2011; 4(1): 131-152. doi: 10.37649/aengs.2011.14268
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 188
  • PDF Download: 73
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap
This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus