[1] Tayeh B.A., Kh. Al-Hallaq KH, and Sabha F.A. (2016). Effects of faulty design phase on school buildings maintenance in gaza strip, Americ. J. Civ. Eng. Arch., 4: 199-210. [https://doi.org/10.12691/ajcea-4-6-2].
[2] Lambropoulos S. (2013). Objective Construction Contract Award using Cost, Time and Durability Utility, Procedia - Social and Behavioral Sciences, 74: 123 – 133.
[3] Mali L. and Warudkar A.A. (2016). Causes of Delay in the Construction Industry in Pune Region of India, International Journal of Application or Innovation in Engineering & Management, 5(5): 306-313.
[4] Syedsalehi H. (2010). Strategic Planning Lecture, Electronic Branch, Islamic Azad University, Tehran.
[5] El-Sheikh A. and Pryke D. (2010). Network gaps and project success, Construction Management and Economics, 28(12): 1205-1217.
[6] Phua F.T.T. (2004). Modelling the determinants of multi-firm project success: a grounded exploration of differing participant perspectives, Construction Management and Economics, 22(5): 451- 459.
[7] Tayeh O.A., El-Hallaq Kh., and Tayeh B.A. (2018). Importance of organizational culture for Gaza strip construction companies, Int. J. Eng. Manage. Res., 8: 35-39, 2018.
[8] El-Hallaq Kh. and Tayeh B.A. (2015). Strategic planning in construction companies in gaza strip, J. Eng. Res. Techno., 2: 167-174, 2015.
[9] Rumane A. R. (2011). Quality Management in Construction Projects, Taylor and Francis Group, LLC, Boca Raton London New York.
[11] Fan M., Lin N., and Sheu C. (2008). Choosing a project risk-handling strategy: An analytical model, International Journal of Project Management, 112: 700–713.
[12] Gudienė N., Ramelytė L., and Banaitis A. (2013). An Evaluation of Critical Success Factors for Construction Projects using Expert Judgment, Proceedings in Scientific Conference. No. 1.
[13] Musarat M. A. and Ahad M. (2016). Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan, Journal of Construction Engineering and Project Management, 6: 1-6. 10.6106/JCEPM.2016.12.4.001.
[14] Saleh S. H. (2004). Developing Construction Materials Planning and Control System for Fast Track Delivery Projects, A thesis submitted to the college of engineering of the university of Baghdad for award of the degree of doctor in construction project management.
[15] Gannett Fleming G. (2009). Construction Project Management Handbook, U.S. Department of Transportation Washington.
[16] Tayeh B., Al-Hallaq Kh., Alaloul W., and Kuhail A. (2018). Factors Affecting the Success of Construction Projects in Gaza Strip, The Open Civil Engineering Journal, 12: 301-315. 10.2174/1874149501812010301.