University of Anbar
  • Register
  • Login

Anbar Journal of Engineering Sciences

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 5, Issue 2
  3. Author

Current Issue

By Issue

By Subject

Keyword Index

Author Index

Indexing Databases XML

About Journal

Aims and Scope

Editorial Board

Publication Ethics

Indexing and Abstracting

Related Links

Peer Review Process

News

Facts and Figures

Reviewers in AJES

Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method

    Faek Lateef Saleh

Anbar Journal of Engineering Sciences, 2012, Volume 5, Issue 2, Pages 226-240
10.37649/aengs.2012.68158

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

This work aims to increase the availability of steam generation plant through modifying boiler maintenance plan by determining the optimum period of time between maintenances to achieve maximum availability via simulation approach.
Applying simulation approach is an attempt to determine the optimum period of time between schedule maintenances to achieve maximum boiler availability. Therefore, PC program in visual basic language is designed as a tool to the implementation of availability simulation approach.
It notes that the boiler availability is increased by (6.9%) in changing the optimum time between scheduled maintenances and inspection to be seven months rather than one year
Keywords:
    Maintenance Simulation Availability Monte Carlo Method Optimum period
  • PDF (1039 K)
  • XML
(2012). Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method. Anbar Journal of Engineering Sciences, 5(2), 226-240. doi: 10.37649/aengs.2012.68158
Faek Lateef Saleh. "Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method". Anbar Journal of Engineering Sciences, 5, 2, 2012, 226-240. doi: 10.37649/aengs.2012.68158
(2012). 'Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method', Anbar Journal of Engineering Sciences, 5(2), pp. 226-240. doi: 10.37649/aengs.2012.68158
Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method. Anbar Journal of Engineering Sciences, 2012; 5(2): 226-240. doi: 10.37649/aengs.2012.68158
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 238
  • PDF Download: 74
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap

This journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)

This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus