University of Anbar
  • Register
  • Login
  • العربیة

Anbar Journal for Engineering Sciences

  • Home
  • Browse
    • Current Issue
    • By Issue
    • By Subject
    • Keyword Index
    • Author Index
    • Indexing Databases XML
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • News
  • Abstracting & Indexing
  • Guide for Authors
  • Submit Manuscript
  • Contact Us
Advanced Search

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 5, Issue 2
  3. Author

ISSN: 1997-9428

Volume5, Issue2

Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method

    Faek Lateef Saleh

Anbar Journal for Engineering Sciences, 2012, Volume 5, Issue 2, Pages 226-240

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

This work aims to increase the availability of steam generation plant through modifying boiler maintenance plan by determining the optimum period of time between maintenances to achieve maximum availability via simulation approach.
Applying simulation approach is an attempt to determine the optimum period of time between schedule maintenances to achieve maximum boiler availability. Therefore, PC program in visual basic language is designed as a tool to the implementation of availability simulation approach.
It notes that the boiler availability is increased by (6.9%) in changing the optimum time between scheduled maintenances and inspection to be seven months rather than one year
Keywords:
    maintenance simulation Availability Monte Carlo Method Optimum period
  • PDF
  • XML
(2012). Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method. Anbar Journal for Engineering Sciences, 5(2), 226-240.
Faek Lateef Saleh. "Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method". Anbar Journal for Engineering Sciences, 5, 2, 2012, 226-240.
(2012). 'Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method', Anbar Journal for Engineering Sciences, 5(2), pp. 226-240.
Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method. Anbar Journal for Engineering Sciences, 2012; 5(2): 226-240.
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 204
  • PDF Download: 61
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
Journal Information

Publisher: University of Anbar

Email:  ajes.uoanbar.edu.iq

Editor-in-chief: Prof. Dr. Yousif Al Mashhadany

  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap
This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus