University of Anbar
  • Register
  • Login
  • العربیة

Anbar Journal for Engineering Sciences

  • Home
  • Browse
    • Current Issue
    • By Issue
    • By Subject
    • Keyword Index
    • Author Index
    • Indexing Databases XML
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • News
  • Abstracting & Indexing
  • Guide for Authors
  • Submit Manuscript
  • Contact Us
Advanced Search

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 5, Issue Issue العدد الخاص - الجزء الثانی
  3. Author

ISSN: 1997-9428

Volume5, IssueIssue العدد الخاص - الجزء الثانی

Design and Establishment of a Small Hydroelectric Plant on the Barrage of Fallujah

    M. Nife

Anbar Journal for Engineering Sciences, 2012, Volume 5, Issue Issue العدد الخاص - الجزء الثانی, Pages 307-316

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

The world is moving now to the energy of water to generate electric power and too much on several considerations, most important is that this energy is a clean and renewable energies as well as reasonably available. So we are going to create a small hydro power stations with limited power can be linked via the national grid or the completion of feeding limited areas to ease the load on the national network in addition to low cost of establishment and the costs of power processed. And now that we need t this specification at this stage and the availability of waterways and weirs in the governorate of AL-anbar has been building this research. We have in this search by selecting the barrage of Fallujah for the establishment of a hydroelectric plant it was a survey of geographical and engineering on the site of this barrage was recorded the water levels over the full year and found that the height of the water in which at least 3.5 meters, so the choice of equipment needed to build a hydroelectric plant with capacity of (140) KW aided with catalogues of well known international companies and accredited globally.
Keywords:
    Barrage of Fallujah Small Hydroelectric Plant Design Site survey
  • PDF
  • XML
(2012). Design and Establishment of a Small Hydroelectric Plant on the Barrage of Fallujah. Anbar Journal for Engineering Sciences, 5(Issue العدد الخاص - الجزء الثانی), 307-316.
M. Nife. "Design and Establishment of a Small Hydroelectric Plant on the Barrage of Fallujah". Anbar Journal for Engineering Sciences, 5, Issue العدد الخاص - الجزء الثانی, 2012, 307-316.
(2012). 'Design and Establishment of a Small Hydroelectric Plant on the Barrage of Fallujah', Anbar Journal for Engineering Sciences, 5(Issue العدد الخاص - الجزء الثانی), pp. 307-316.
Design and Establishment of a Small Hydroelectric Plant on the Barrage of Fallujah. Anbar Journal for Engineering Sciences, 2012; 5(Issue العدد الخاص - الجزء الثانی): 307-316.
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 81
  • PDF Download: 8
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
Journal Information

Publisher: University of Anbar

Email:  ajes.uoanbar.edu.iq

Editor-in-chief: Prof. Dr. Yousif Al Mashhadany

  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap
This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus