Anbar Journal of Engineering Science
Login
Anbar Journal of Engineering Sciences
  • Home
  • Articles & Issues
    • Latest Issue
    • All Issues
  • Authors
    • Submit Manuscript
    • Guide for Authors
    • Authorship
    • Article Processing Charges (APC)
  • Reviewers
    • Guide for Reviewers
    • Become a Reviewer
    • Reviewers of AJES
  • About
    • About Journal
    • Aims and Scope
    • Editorial Board
    • Journal Insights
    • Peer Review Process
    • Publication Ethics
    • Plagiarism
    • Allegations of Misconduct
    • Appeals and Complaints
    • Corrections and Withdrawals
    • Open Access
    • Archiving Policy
    • Journal Funding Sources
    • Announcements
    • Contact

Search Results for ore-performance

Article
Evaluation of Overall Resource Effectiveness for Job Shop Production System

Lamyaa Mohammed Dawood, Anat Amer Khudairb

Pages: 362-371

PDF Full Text
Abstract

ORE addresses various kinds of losses associated with manufacturing system which can be targeted for initiating improvements. Evaluating ORE will is helpful to the decision maker(s) for further analysis and continually improves the performance of the resources. Overall Resource Effectiveness (ORE) encompasses seven factors are; performance, quality rate, readiness, changeover efficiency, availability of material and availability of manpower. In this research Job shop production of General Company for hydraulic industries, with focus on Damper and Tasks Factory (DTF)is tested as a case study for two of the most customer demand rear dampers (Samaned and Nissan). Data are collected and analyzed for years 2016-2017 to evaluate of ORE values. Results show that process performance factor among other seven factors have the less value causing the highest loss in ORE decrease. Where the highest ORE value is (58.6%) for Nissan and (69.3) for Samaned rare production. Also, time loss due to set up time is detected where it ranges from 3% to about 13% per month for the above mentioned two tested dampers. Results are generated employing Minitab Version 17, Quality Companion Version 3 soft wares. It is recommended to introduce SMED (Single Minute Exchange of Dies) concept that could decrease losses in set up time .Also improvements in maintenance programs are vital, and above all improving process performance values is essential by employing lean manufacturing that result in fast outcomes ,and TQM process improvement strategy for long term outcomes these two process performance strategies may enhance ORE values therefore, decrease losses, and consequently increase quality and productivity.

1 - 1 of 1 items

Search Parameters

Journal Logo
Anbar Journal of Engineering Sciences

University of Anbar

  • Copyright Policy
  • Terms & Conditions
  • Privacy Policy
  • Accessibility
  • Cookie Settings
Licensing & Open Access

CC BY 4.0 Logo Licensed under CC-BY-4.0

This journal provides immediate open access to its content.

Editorial Manager Logo Elsevier Logo

Peer-review powered by Elsevier’s Editorial Manager®

       
Copyright © 2025 College of Engineering, University of Anbar. All rights reserved, including those for text and data mining, AI training, and similar technologies.